AACE RP 29R-03 · SCL Protocol
1
Method
2
Analyse
3
Review
4
EOT Report
Choose your analysis method
Select the forensic methodology. EOTForge will guide you through the rest.
🪟
Windows Analysis
AACE RP 29R-03 §3.3
Divides the project into time windows defined by programme update data dates. Measures forecast shift per window. Ideal when multiple updates exist. Most widely accepted by tribunals.
🏗️
Collapsed As-Built
AACE RP 29R-03 §3.5
Removes delay events from the as-built schedule to derive what completion would have been without them. Useful where updates are unavailable.
Coming Soon
📊
Time Impact Analysis
AACE RP 29R-03 §3.7
Inserts discrete delay events into the programme to measure their individual impact on completion.
Coming Soon
📅
As-Planned vs As-Built
AACE RP 29R-03 §3.2
Direct comparison of planned vs actual dates without programme update data.
Coming Soon
Project Intelligence — Optional but Impactful
📋
Contract Setup
Contract type, LD rate, notice deadlines, HO overhead — auto-applied throughout the entire analysis
⚡ Very High Impact Optional
Auto-filled when contract type selected above
Used for Hudson/Emden HO claim. Typically 5–15%.
⚠ Estimated LD Exposure (before EOT)
Enter delay days and LD rate to calculate
⚖️
Concurrency Legal Test
When concurrent delay is detected, which test applies? Affects EOT entitlement directly
⚡ High Impact Optional
The dominant cause test is the most common in English / FIDIC jurisdictions. The apportionment test is required under NEC4. Selecting "Show all three" lets your legal team choose the most favourable position.
🌍
Site Location & Weather Intelligence
Auto-detect adverse weather periods qualifying for EOT under FIDIC Sub-Clause 8.5
⚡ High Impact Optional
Common in GCC contracts — excluded from contractor delay liability.
Upload your XER files
Drop all your P6 XER files — in any order. EOTForge will read each file's internal data date, detect the baseline and sequence automatically, then ask you to confirm before running the Windows Analysis.
📂
Drop .xer files here
Any order — EOTForge auto-detects sequence from data dates
Running Windows Analysis
AACE RP 29R-03 §3.3 in progress…
Parsing XER files
CPM forward & backward pass
Calculating float
Critical path identification
Windows Analysis
Attributing delay causes
Building Excel workbook
Optional Data — Dramatically Boosts Analysis Accuracy
📋
RFI & Submittal Log
Auto-identify Design Approval delays from late Engineer responses — the #2 cause of delay globally
⚡ High Impact Optional
Upload your RFI log as Excel or CSV. Required columns: RFI No · Date Submitted · Date Responded · Subject. EOTForge calculates response delays and links them to schedule activities.
📊
Upload RFI Log (.xlsx / .csv)
Drag & drop or click to browse
✓ File selected
🔄
Variation / Change Order Register
Variations are the #1 cause of delay globally — link each VO to its schedule impact
⚡ Very High Impact Optional
Upload your VO register. Required columns: VO No · Date Issued · Description · Status (Agreed / Disputed). EOTForge identifies late-issued VOs and calculates their time impact.
📑
Upload VO Register (.xlsx / .csv)
Drag & drop or click to browse
✓ File selected
📧
Project Correspondence Bundle
AI mines your emails, letters & minutes — auto-links evidence to each delay cause
⚡ Very High Impact Optional
Upload PDFs or Word documents. EOTForge reads each one, extracts dates and delay references, then auto-links evidence to matching causes. Up to 20 files, 5 MB each.
📁
Upload Correspondence (.pdf / .docx)
Multiple files allowed — up to 20 documents
✓ Files selected
Notice Compliance Checker
The #1 reason valid claims fail — check your notice dates against the contract time bar before submission
⚡ Very High Impact Fill after analysis
After running the analysis, enter the date each notice was served. EOTForge checks against your contract's time bar: FIDIC = 28 days · NEC4 = 56 days · JCT = "forthwith".
Run analysis first — notice compliance table will appear here
🌪️
Force Majeure & Exceptional Events
Define any Force Majeure periods — these get EOT but typically no prolongation costs (FIDIC)
⚡ Medium Impact Optional
Add any Force Majeure / Exceptional Events that affected the project. Each event will be separately classified in the delay register — neutral party, EOT-only (no costs).
Upload your reviewed Excel
Upload the Delay Causes Identified file after you have reviewed each delay event, confirmed the Responsible Party, and added descriptions. EOTForge will read your reviewed register and use it to generate the EOT Report.
📋
Drop your reviewed Excel here
EOTForge_Delay_Causes_Identified.xlsx
Reading Delay Register
Parsing your reviewed classifications…
Generate your EOT Report
Enter the contract details below and optionally upload the contract document. EOTForge will generate a formal, AACE and SCL-compliant Extension of Time report as a Word document.
Contract Details
Contract Document (optional)
📄
Drop contract PDF or DOCX here
Optional — EOTForge will extract party names and dates
Generating EOT Report
Building your AACE & SCL-compliant Word document…
Quantum & Financial Data — Adds Monetary Value to Your Claim
💰
Prolongation Cost Calculator
Time-related site costs during the delay period — the financial heart of any EOT claim
⚡ Very High Impact Optional
Enter your weekly time-related site costs. EOTForge maps these to compensable delay windows and calculates total prolongation costs per SCL Protocol — Compensation for Prolongation.
Weekly Prolongation Rate
Head Office Overhead will be added automatically using the Hudson formula and the HO % entered in Step 1.
📈
Finance Charges & Escalation
Delayed projects generate finance costs and price escalation — both recoverable under FIDIC
⚡ Medium Impact Optional
Used to calculate finance charges on prolonged expenditure. Reference: FIDIC Sub-Clause 14.8 / 2017 Sub-Clause 20.2.
Annual price rise in key materials (steel, concrete, labour) since contract award. Common in post-2021 projects.
🏗️
Subcontractor Back-to-Back Claims
Pass up sub-claims to the Employer — these form part of the main EOT claim quantum
⚡ High Impact Optional
Enter any subcontractor EOT / prolongation claims that are pass-through entitlements under back-to-back contract provisions.
📝
Project Background & Claim Narrative
Give the AI full context — produces dramatically more professional and persuasive claim language
⚡ Very High Impact Recommended